Project: Bovine-RV14A   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Jeff Lawson   -  
Project:   Vans - RV-14A   -   VIEW REPORTS
Total Hours:601.5
Total Flight Time:
Start/Last Date:Jan 28, 2022 - No Finish Date
Engine:Lycoming YIO-390-EXP119 non-cert
Propeller:Hartzell G2YR/N7605W-2X 74 in. dia composite 2-blade
Panel:Dynon Skyview
 
Friendly URL: https://eaabuilderslog.org?s=Bovine-RV14A

Home or Last Project Picture

May 20, 2022     Dimpling and scuffing right flap - (3.0 hours)       Category: Flaps
I disassembled the rest of the right flap so that I could continue dimpling the rest of the ribs and skins. I was doing as much of the dimpling using my hand squeezer, but I eventually needed my first use of the DRDT2 dimpler in order to reach some of the holes that were too far from the edge of the sheet metal.

After that I started using a scotch brite pad to scuff up all of the ribs and brackets to prepare them for eventually being primed. For the flap spar, I found that a flap disk made from scotch brite pads worked pretty well down its recessed channel.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.